Engineering

Specialized Engineering Team

FAST is Specialized in the following field with its own Engineering Team. We are Executing all types of Fire Suppression Systems Projects to protect Industries, Hospitals, Hotels, Institutions, Commercial Complexes, High Rise Buildings, etc., complying with the norms of Director Factories & Boilers, NBC & State Fire Prevention and Fire Safety Rules.

We are one of the top Fire & Safety Companies in Eastern India, having a rich experience when it comes to Fire Detection and Extinguishing Systems. We are tied up with India’s most reputed & branded OEMs like Newage, Kanex, Minimax, HD Fire, Winco, KV Fire, Ceasefire, etc.

Our Expertise

Fire Alarm & Detection System
Fire Hydrant / Hose Reel & Sprinkler System
Dry Riser / Wet Riser / Down Comer System
HVW / MVW / Spray System
Water Mist / Gas Suppression System
Manual Fire Siren / Public Address System
Fire Exit & Escape System

Fire Engineering (S / I / T / C)

Supply, Installation, Testing & Commissioning

Core Systems

Hydrant & Sprinkler
Down Comer & Riser
HVWS & MVWS System
Panel Suppression System
Fire Detection & Alarm System

Scope of Work

1

Survey, Design & Engineering

  • Detailed site survey and risk assessment
  • Fire protection system design as per NBC 2016, OFS Rules, BIS/IS Codes & NFPA
  • Hydraulic calculations for fire water demand & pressure
  • Preparation of Fire Layout Drawings, Schematic Diagrams & System Calculations
  • Fire safety compliance planning for Fire NOC / CFO approval
2

Supply (S)

  • Fire pumps (Electric, Diesel & Jockey) with controllers
  • Fire water storage tanks (RCC / Steel / Zinc-Aluminium)
  • Sprinkler systems, hydrant systems & hose reel systems
  • Fire alarm & detection systems
  • Valves, pipes, fittings, nozzles & accessories
  • Fire extinguishers (portable & trolley mounted)
  • Control panels, cables & monitoring devices
3

Installation (I)

  • Installation of fire pumps, pipelines & valves
  • Installation of sprinkler, hydrant & hose reel networks
  • Installation of fire detection, alarm & PA systems
  • Mounting of panels, sensors, detectors & manual call points
  • Proper supports, painting & identification tagging
4

Testing (T)

  • Hydrostatic testing of pipelines
  • Pressure & flow testing of pumps
  • Functional testing of sprinklers, hydrants & hose reels
  • Fire alarm & detection system testing
  • Integrated system performance testing
5

Commissioning (C)

  • System commissioning in presence of client / authority
  • Performance verification as per approved design
  • Trial run & system demonstration
  • Rectification of punch points, if any
6

Documentation & Handover

  • As-built drawings
  • Operation & Maintenance (O&M) manuals
  • Test certificates & compliance documents
  • Fire safety plan & emergency response procedures
  • Support for Fire NOC / CFO inspection & approval
7

Training & Support

  • Training of client fire crew / maintenance staff
  • Mock drill & emergency response training
  • Warranty & post-installation technical support
  • AMC / O&M services (optional)

Applicable For

Industrial Plants High-Rise Buildings Commercial Complexes Hospitals, Hotels & IT Parks Warehouses & Logistics Facilities

EPC PROJECT – FIRE DETECTION & SUPPRESSION SYSTEM

Scope of Work

1. Engineering (Design & Consultancy)

1.1 Site Assessment & Data Collection
  • Site survey and fire risk assessment
  • Review of architectural, structural, and utility drawings
  • Identification of hazard classification & fire load
  • Assessment of water source and power availability
1.2 System Design & Calculations
  • Hydraulic calculations for hydrant & sprinkler systems
  • Pump capacity and head calculations
  • Zoning and coverage design
  • Water storage (UG/OH tank) sizing
  • Detection & suppression logic (where applicable)
1.3 Detailed Engineering Deliverables
  • GA drawings & layout plans
  • P&ID / SLD for firefighting systems
  • Fire pump room layout
  • Sprinkler, hydrant, hose reel layouts
  • Detection & alarm system drawings
  • Cable routing & earthing details
  • Technical specifications & BOQ
  • Compliance matrix
1.4 Statutory Liaison & Approvals
  • Design submission to Local Fire Authority
  • Coordination for Fire NOC / Fire Safety Certificate
  • Compliance with insurance & statutory requirements

2. Procurement

2.1 Supply of Equipment & Materials
  • Fire pumps: Electric pump, Diesel pump, Jockey pump
  • Fire pump controllers & panels
  • Hydrant valves, landing valves, hose boxes
  • Sprinklers (upright, pendent, sidewall, deluge)
  • Piping (MS / GI / HDPE / SS) and fittings
  • Fire hoses, nozzles, couplings
  • Detection & alarm devices (smoke, heat, MCP, hooters)
  • Gas / foam / water-mist systems (if applicable)
  • Fire extinguishers of all types
  • Cables, trays, earthing materials
2.2 Quality & Compliance
  • BIS / UL / FM approved materials
  • Test certificates & manufacturer data sheets
  • Factory inspection (if required)

3. Construction & Installation

3.1 Civil & Structural Works
  • Pump house construction / modification
  • Fire water tank (UG/OH) construction or lining
  • Foundations for pumps & panels
  • Sleeves, trenches, and supports
3.2 Mechanical Installation
  • Installation of fire pumps and alignment
  • Piping erection, welding, grooving & threading
  • Valve installation and tagging
  • Sprinkler and hydrant system installation
  • Hose reel and monitor installation
  • Painting & color coding as per standards
3.3 Electrical & Instrumentation Works
  • Power cabling for pumps & panels
  • Fire alarm cabling and device installation
  • Earthing and bonding
  • Integration with BMS / SCADA (if applicable)

4. Testing, Commissioning & Performance Validation

  • Hydrostatic pressure testing of pipelines
  • Flushing and cleaning of pipelines
  • Pump performance testing (flow, pressure, auto start)
  • Sprinkler and hydrant system flow tests
  • Alarm, detection & interlock testing
  • Functional testing of suppression systems
  • Joint inspection with client & fire authority

5. Documentation & Handover

  • As-built drawings
  • Operation & Maintenance (O&M) manuals
  • Test certificates & inspection reports
  • Warranty & guarantee documents
  • Training manuals
  • Fire logbooks & checklists

6. Training

  • System operation training for client staff
  • Routine inspection & maintenance training
  • Emergency response & mock drill support

7. Defect Liability & AMC

  • Defect Liability Period (DLP) support
  • Rectification of defects during DLP
  • Optional Comprehensive / Non-Comprehensive AMC

8. Codes, Standards & Compliance

System shall comply with:

  • National Building Code (NBC) of India
  • Relevant IS Codes (IS 15105, IS 2190, IS 3844, IS 13039, etc.)
  • TAC / Insurance guidelines
  • NFPA standards (where applicable)
  • Local Fire Service Rules
  • Factory Act & Occupational Safety norms

9. Exclusions (Unless Specifically Mentioned)

  • Major architectural changes not related to fire system
  • Third-party statutory fees
  • Utility supply beyond project boundary
  • Hazmat or specialized suppression unless specified

10. Completion & Acceptance

  • Successful completion upon acceptance by client
  • Fire NOC / Fire Safety Certificate support
  • Final handover and project closure

425 KL Zinc-Aluminium Fire Water Tank

Why it is Better than RCC Tank

1. Faster Installation & Commissioning

  • Zinc-Aluminum (ZA) Tank: Factory-fabricated modular panels; installation completed in 7–10 days
  • RCC Tank: Requires excavation, shuttering, reinforcement, concreting & curing (2–3 months)
  • ✅ Faster Fire NOC & project completion

2. Superior Corrosion Resistance

  • ZA tanks use Zinc-Aluminum alloy coating (≈ 90% Zinc + 10% Aluminum)
  • Offers 4–6 times higher corrosion resistance than ordinary galvanized steel
  • RCC tanks suffer from concrete cracking, steel reinforcement corrosion, and water seepage
  • ✅ Ideal for fire water storage where water remains stagnant for long periods

3. 100% Leak-Proof Design

  • EPDM / food-grade rubber gaskets
  • Bolted construction with uniform pressure sealing
  • No shrinkage or hairline cracks (common in RCC)
  • ✅ Maintains assured fire water availability at all times

4. Long Service Life & Low Maintenance

Parameter ZA Tank RCC Tank
Service Life 30–40 years 15–20 years
Maintenance Very low High (repairs, waterproofing)
Recoating Not required Frequent

✅ Lower life-cycle cost

5. Structural Flexibility & Safety

  • Designed to withstand seismic loads, differential settlement & thermal expansion
  • RCC tanks are rigid and prone to cracking under ground movement
  • ✅ Safer for industrial & seismic zones

6. Compact Footprint & Lighter Foundation

  • ZA tank is lightweight; requires minimal civil foundation
  • Suitable for retrofit projects & space-constrained sites
  • ❌ RCC tanks require heavy foundation & large excavation

7. Easy Capacity Expansion & Relocation

ZA tank capacity can be expanded in future. Can be dismantled and relocated. RCC tanks are permanent.

8. Compliance with Fire & Insurance Norms

Accepted by NBC of India, TAC / Insurance guidelines, and Fire Authorities. Preferred for EPC fire protection projects.

9. Cost-Effective Over Project Life

Although initial cost may be slightly higher, total ownership cost is much lower (No civil repairs, No water loss, No corrosion treatment).

Conclusion

A 425 KL Zinc-Aluminum Fire Water Tank offers faster installation, superior durability, leak-free performance, low maintenance, and better compliance, making it a technically and economically superior choice over traditional RCC tanks for fire protection systems.